DAWGTOY |
Puppy Mill Maker |
 |
|
Joined: 14 Nov 2005 |
Posts: 2684 |
|
|
|
 |
 |
 |
|
yesterday i picked up the rebuild kit.
includes all gaskets and seals--rod and main bearings 10 over--
new pistons and rings 20 over---timing chain and guides (steel backed
dual row). i still need an oil pump--i'll get it later.
last night i finished polishing the valves (weight balanced to within
.5 gram) weighted the pistons,rings,rods,bearings,piston pins and clips
so i have an overall weight to give the machine shop so they can
balance the crank. the block should be finished bored today.
i'll leave the front cover and valve cover with them to be cleaned
when i pick it up.
it'll be good to get the block back so i can start cleaning and painting
it. after the machine shop is finished balancing the crank i can start
assembly.
tonight i'll finish gasket matching the ports, clean, lap in the valves
and reassemble the head.
it's gettin there.
dododawg |
|